3WA were appointed to design and deliver the rationalisation and modernisation of the fixed base operation for Signature Flight Services at Luton airport. This included the removal of a number of hangers to increase ramp space as well as the construction of a new operations and passenger terminal building. 3WA obtained full planning permission and the site has subsequently been built out.
Client Signature Flight Services
Structural Engineer Capita
Cost Consultant EC Harris