Signature Flight Services, Luton Airport

3WA were appointed to design and deliver the rationalisation and modernisation of the fixed base operation for Signature Flight Services at Luton airport. This included the removal of a number of hangers to increase ramp space as well as the construction of a new operations and passenger terminal building. 3WA obtained full planning permission and the site has subsequently been built out.


Client Signature Flight Services
Structural Engineer Capita
Cost Consultant EC Harris